top of page

PISTIL BLOG


The Power Of Scan-To-BIM
An entertainment operator was preparing for a new venue build-out in El Cajon. The team inherited base building drawings, but as is typical for these types of projects, the documentation could not be relied upon as a definitive record of existing conditions. With a fixed lease and millions in upfront capital at stake, a detailed field survey was required to accurately plan layouts, attractions, and system coordination. Had they relied solely on those drawings, conflicts betwe

PISTIL
PISTIL
PISTIL
bottom of page
